Your Location:
Home >
Browse articles >
Commissioning and operation of the cryostat for 3W1 SC wiggler
SYNCHROTRON RADIATION TECHNOLOGY AND APPLICATIONS | Updated:2023-08-14
    • Commissioning and operation of the cryostat for 3W1 SC wiggler

    • Commissioning and operation of the cryostat for 3W1 SC wiggler

    • 核技术(英文版)   2023年34卷第6期 文章编号:96
    • DOI:10.1007/s41365-023-01232-0    

      中图分类号:

    Scan for full text

  • 引用本文

  • Commissioning and operation of the cryostat for 3W1 SC wiggler[J]. 核技术(英文版), 2023, 34(6):96 DOI: 10.1007/s41365-023-01232-0.

    Miao-Fu Xu, Xiang-Zhen Zhang, Rui Ye, et al. Commissioning and operation of the cryostat for 3W1 SC wiggler[J]. Nuclear Science and Techniques, 2023, 34(6):96 DOI: 10.1007/s41365-023-01232-0.

  •  

    0

    浏览量

    0

    Downloads

    0

    CSCD

    文章被引用时,请邮件提醒。
    Submit
    工具集
    下载
    参考文献导出
    分享
    收藏
    添加至我的专辑

    相关文章

    Hard X-ray focusing resolution and efficiency test with a thickness correction multilayer Laue lens
    Picosecond time-resolved X-ray ferromagnetic resonance measurements at Shanghai Synchrotron Radiation Facility
    Superconducting multipole wiggler with large magnetic gap for HEPS-TF
    Design, assembly, and pre-commissioning of cryostat for 3W1 superconducting wiggler magnet
    Train probe for beam diagnostics of the SC200 superconducting cyclotron

    相关作者

    暂无数据

    相关机构

    Institute of High Energy Physics, Chinese Academy of Sciences, 19B Yuquan Road
    University of Chinese Academy of Sciences, 19A Yuquan Road
    School of Physics Science and Engineering, Tongji University, Siping Road1239, Yangpu District
    Shanghai Institute of Applied Physics, Chinese Academy of Sciences
    Shanghai Synchrotron Radiation Facility, Shanghai Advanced Research Institute, Chinese Academy of Sciences
    0